


|
sponsored by APC
|
|
|
Posted:
|
02 Nov 2009
|
|
Published:
|
02 Nov 2009
|
|
Format:
|
PDF
|
|
Length:
|
18
Page(s)
|
|
Type:
|
White Paper
|
|
Language:
|
English
|
|
|
ABSTRACT:
Failure to properly commission a data center leaves the door wide open for expensive and disruptive downtime that could have been avoided. Integrated commissioning of all physical infrastructure components assures maximum data center performance and justifies the physical infrastructure investment. This paper reviews the desired outputs and identifies the standard inputs of the commissioning data center project step. The commissioning process flow is described and critical success factors are discussed. The commissioning process inputs and outputs are also placed in context with other key data center project process phases and steps.
|
|
|
|
 |
BROWSE RELATED
RESOURCES
Cooling Capacity | Data Center Design | Data Center Infrastructure Efficiency | Downtime | Power Generation Equipment | Systems Management
|
View All Resources
sponsored by APC
|
|
Databasecorner.com Research Library Copyright © 1998-2009 Bitpipe, Inc. All Rights Reserved. Designated trademarks and brands are the property of their respective owners. TechTarget · 117 Kendrick St · Needham, MA · 02494
Use of this web site constitutes acceptance of the Bitpipe Terms and Conditions and Privacy Policy. webmaster@bitpipe.com
|